Assembly Page 3

    

Gas Tank And Windshield Is Installed. It Is Now Starting To Look Like It Is Going Together. (04/11/99).

    

In The Above Photos The Engine Is Running. There Is A View Of Both Sides Of Engine. This Was The First Startup Of The Engine Since Rebuilding. (04/18/99).

    

Other Views Of Pickup Running. (4/18/99)

    

All Interior Panels And Seat Coverings Now Installed. (4/20/99).

    

Hood Shelves Installed And Wiring Harness Placed And Clamped Down. (4/21/99).

    

Radiator Splash Apron Is Installed And Crank Put In. (4/21/99). Wire Wheels Added (4/24/99).

Next Assembly Page (4)

Back To '27 Pickup Start Page