Assembly Page 3
Gas Tank And Windshield Is Installed. It Is Now Starting To Look Like It Is Going Together. (04/11/99).
In The Above Photos The Engine Is Running. There Is A View Of Both Sides Of Engine. This Was The First Startup Of The Engine Since Rebuilding. (04/18/99).
Other Views Of Pickup Running. (4/18/99)
All Interior Panels And Seat Coverings Now Installed. (4/20/99).
Hood Shelves Installed And Wiring Harness Placed And Clamped Down. (4/21/99).
Radiator Splash Apron Is Installed And Crank Put In. (4/21/99). Wire Wheels Added (4/24/99).